Building Permits - Commercial

Work Requiring a Permit

  • Backflow
  • Pools/Spas
  • Electrical
  • Irrigation
  • Mechanical
  • Plumbing
  • Grading
  • Accessory Buildings
  • Remodels/Additions to Building

Plans Require Upon Submittal

  • Site Plan
  • Building Plan Set
  • Drainage/Grading Plans
  • Wall Bracing Plans
  • Engineered Foundation Plans
  • Tree Conservation/Mitigation Plans
  • Energy Compliance Report
  • Landscape Plans

Permit Submittal

Dental Office Requirements

Dental Offices that discharge wastewater that contains dental amalgam to the sanitary sewer must install, inspect, and maintain a dental amalgam separator. Mercury fro waste amalgam can end up in the environment from Publicly Owned Treatment Works (POTW) through incineration, land filling, or land application. Dental Offices must fill out the OTCR Dental Dischargers Form upon application for a dental office building, finish-out, or CO. 

For more information view the following New Dischargers Packet.

Fire Sprinklers

Per Town ordinance, all buildings must be equipped with an automatic fire sprinkler system. Fire sprinkler plans must be submitted by the project’s licensed Fire Protection Contractor to:

Reed Fire Protection

Amberton Tower
4144 N. Central Expressway, Suite 510
Dallas, TX 75204
(214) 638-7599


The project applicant is responsible for review fees charged by the third party review service. Approved plans are forwarded to the Fire Marshal’s office.

  1. Inspection Line

    Phone: 817-490-5718

  2. Dottie Samaniego

    Permit Technician
    Phone: 817-490-5745

  3. Pat Cooke

    Chief Building Official

Documents